Day 16 has been a bit unusual, in that it is a Saturday. The crew was here for a few hours to finish the tiling, install baseboards, and a few other things.
|
Finished tile, including marble shelf and threshold, in the shower stall (will be grouted on Monday). |
|
Finished tile backsplash behind toilet and sink spots. |
|
Washer and dryer in place!! And just in time, because our laundry is piling up. |
|
The new bathroom from outside, looking towards the back door. Baseboards have been installed. Looks like it was meant to be there, doesn't it? |