| New mirror and shelves for toiletries, etc. |
| New shelves for laundry and cleaning supplies. |
| Happy bathing! |
| New mirror and shelves for toiletries, etc. |
| New shelves for laundry and cleaning supplies. |
| Happy bathing! |
| Outside of the new room. To the left you can see the door to the small storage closet. The lighted doorway leads into the bathroom itself. |
| Beautiful new toilet, sink, and light, now in their proper places. The toilet is like the one in our existing bath. How about that sink? |
| Laundry area, with sconces, new window, and vents for dryer and exhaust fan. |
| Shower stall, with open door. |
| Another view of the sink, light, and exhaust fan. |
| Finished tile, including marble shelf and threshold, in the shower stall (will be grouted on Monday). |
| Finished tile backsplash behind toilet and sink spots. |
| Washer and dryer in place!! And just in time, because our laundry is piling up. |
| The new bathroom from outside, looking towards the back door. Baseboards have been installed. Looks like it was meant to be there, doesn't it? |
| Our big, beautiful utility sink. |
| The sink's special supportive P-trap, which has caused us much thinking and consternation at different points. |
| Some tile has to come off before more can go on. |
| Sconces above the laundry area are in; they match the 3-bulb vanity light. |
| Smart looking tile. We went with an oversized subway tile; I think it's about 4"x8". |
| The tile chair rail ends here because the washer & dryer will go into this corner. Seemed like overkill to take the tile behind them, never to be seen again. |
| Outside walls painted, tiling of shower stall and chair rail begun. |
| Subway tile in shower and on wall. |
| Wall around window and vents complete. |
| The former hole! |
| Second, smaller hole for washer drainage. Now not a hole. |
| Electrical stuff. |
| More electrical stuff. |
| Looking into the new room from outside. The shower stall is right in front. |
| Inside looking out. The white bucket marks the toilet's spot. The two rods jutting out of the green wall are the supply lines for the sink. |
| The exterior wall got insulated. |
| Outside the new bathroom. |
| Inside the new bathroom, looking towards where the washer and dryer will go. |
| New water supply lines routed outside the space. |
| New connecting to old. |
| New washer hookups. |
| Overview |
| Big pile of dirt, now more neatly piled. |
| Detail of waste plumbing. The line shooting up to the upper right corner of the picture is for the sink. In the lower left, capped in blue, is the shower drain. The toilet is in the middle. |
| Waste line for washer. |
| Future plumbing parts...these look exciting! |
| The small line in bath is the new shower drain; the larger one in front is for the new toilet. |
| Pile of dirt from underneath the floor |
| The hole! |
| The main sewer line that runs under the house is visible here. Finding this was the goal of the hole. |
| A secondary hole to expose one of the waste stacks. |
| Our permit! Posted in the front window of our house. |